Joined
·
2,212 Posts
7 months. $1,500 over budget and some stress due to a flaky painter. But she’s done finally.
tire pressure monitor. Voltage meter and accessory buttons for the led lights and air suspension.Your bars are really busy, but you did a great job making it work. I'm not sure I could have packaged it that cleanly. Kudos my brother.
I really love it! Seriously, great job brother!
Outstanding! the only nit I wanna pick is the differential looks plain compared to the rest. Otherwise, very nice! Go embarrass some HD’s now. lol
I looked long and hard for pipes, unfortunately the stupid CA CAFE standards make it impossible to get pipes here, no way to hear them or see them in person because they are illegal to sell here, so is the Dynojet PC5.Bike looks great. Im a huge fan of those pipes. Its making me not enjoy my cobras as much haha.
no cross over tube.Can't say I have ever witnessed a handicap license plate on a cycle.
Nice job on the X, crossover tube in the pipes?
yeah this dude had every excuse in the book why his "should be done in 3 weeks" took nearly 7 months.Flaky painter? I saw what you did there.
Great job Sir. I like it. A lot. Tastefully and cleverly done. Enjoy every ride!